Dobologic, DB Schenker & Bakker Tilburg

TILBURG

  • OVERVIEW

    Dobologic, DB Schenker & Bakker Tilburg

    The logistics centre located at De Katsbogten Industrial Park provides a base for the logistics companies Dobologic, DB Schenker and Bakker Logistics.

    The various companies based within this logistics centre each supply a different category of logistics services. Dobologic provides storage and distribution services for Dobotex, a manufacturer of socks and underwear. DB Schenker Logistics provides space for the logistics handling of pharmaceutical and medical aids. Bakker Logistics stores and distributes chilled products for Friesland Campina.

    Total size (m2)

    63.715

    Warehouse size (m2)

    38.000

    Number of docks

    50

    Max. storage height (m)

    10.7

    Office size (m2)

    1.825

    Mezzanine size (m2)

    4.300

    Parking lots

    250

    Floor pressure (kn)

    4.000
    icon-1

    A58

    icon-2

    Rail Terminal Tilburg

    icon-3

    AMS 123 km 33 km

    icon-4

    Barge Terminal Vossenberg West II

  • FEATURES & DETAILS

    KEY FEATURES

    The logistics centre located at De Katsbogten Industrial Park provides a base for the logistics companies Dobologic, DB Schenker and Bakker Logistiek. The various companies based within this logistics centre each supply a different category of logistics services. Dobologic provides storage and distribution services for Dobotex, a manufacturer of socks and underwear. DB Schenker Logistics provides space for the logistics handling of pharmaceutical and medical aids. Bakker Logistiek stores and distributes chilled products for Friesland Campina.

    Total size (m2)

    63.715

    Warehouse size (m2)

    38.000

    Number of docks

    50

    Max. storage height (m)

    10.7

    Office size (m2)

    1.825

    Mezzanine size (m2)

    4.300

    Parking lots

    250

    Floor pressure (kn)

    4.000

    FEATURES & INNOVATION

    See how we developed this project

     

     

    UNIQUE FEATURES & INNOVATION

    The logistics centre was constructed within an impressively short timeframe. After a construction period of just four months, Dobologic was able to move into the building. The distribution centre comprises 10,000 m² of chilled warehousing facilities for Bakker Logistiek. The central section is leased by DB Schenker Logistics for the provision of logistics handling of pharmaceuticals and medical aids.

     

    FEATURES & INNOVATION

    • 30,900 m² superflat floor
    • 12,000 m² cooled commercial space
    • 2,365 m² channel plate floor
    • 12,466 m² facade cladding
    • 55 loading docks
    • 4-months to complete phase 1
  • FILES & MEDIA

    DOCUMENTS & BROCHURES

    In this section you can download reports, brochures and find other related files regarding this project. If you have any questions or want to request more specifics, do not hesitate to contact us at our contact page.